PLC Automation and Programming
Clean, fully documented, maintainable code your team can read. ISA-88 / ISA-95 compliant. Version controlled.


Your PLC problems
end here.
Certified PLC engineers — not sales reps. When your line stops, you need someone who knows your exact controller, can VPN in within 30 minutes, and won't hang up until you're running again.
1,200+ PLCs programmed across Allen-Bradley, Siemens, Mitsubishi, Omron, Beckhoff and Keyence. From legacy PLC-5 migrations to brand-new ControlLogix commissioning — the entire lifecycle of your control systems.
…you need specialists who live and breathe PLC programming.
One call. One engineer who knows your system. No runaround.
Clean, fully documented, maintainable code your team can read. ISA-88 / ISA-95 compliant. Version controlled.
Legacy PLC-5 / SLC 500 / S7-300 to modern controllers. Production cutover in a single weekend window.
On-site I/O checkout, FAT/SAT, dry runs, ramp-up. We work alongside your team until the line is at rate.
Production down? Remote in within 30 min during business hours, 2 h after hours. 85 % resolved without dispatch.
Standard / Priority / Critical tiers with guaranteed response. Your dedicated engineer learns your systems.
GuardLogix, Safety Integrated, Pilz PNOZmulti. Safety logic that protects people and keeps the line running.
Every PLC project we deliver fits a layered reference architecture — physical I/O at the bottom, business systems at the top. We own all five layers and the protocols between them.
Also supported on request: ABB AC500 · Schneider Modicon · GE/Emerson RX3i · Honeywell ControlEdge
Engineer-to-engineer call. We map your installed base, network topology, and production constraints. No sales pitch.
Detailed scope of work with fixed pricing, timeline, and deliverables list. Hardware, labor, contingency.
Senior engineer programs, simulates, and tests. Daily updates, weekly milestone review, version control.
I/O checkout, dry runs, ramp-up, operator training. Production at rate before sign-off.
30-day post-cutover support included. Optional ongoing contract with named engineer and SLA.
A Tier 1 automotive supplier was running critical assembly operations on PLC-5 controllers installed in 1998. 12 processors, 47 stations, zero tolerance for unplanned downtime. Spare parts on 6-week lead times.
"iAutomate delivered exactly what they promised. Three weekends, zero surprises, no production loss."
Allen-Bradley (Rockwell), Siemens, Mitsubishi, Omron, Beckhoff, Keyence as primary platforms. Also ABB AC500, Schneider Modicon, GE/Emerson, Honeywell when needed. We adapt to your installed base — we don't push a brand.
Remote support within 30 min during business hours. 24/7 emergency hotline with 2-hour response. Same-day on-site dispatch across the U.S. Midwest. Engineer named on your account knows your system before they pick up.
Both. ~85 % of issues resolved remotely via secure VPN. On-site available across U.S., México, and Canada for commissioning, hardware swaps, and complex faults.
A single PLC-5 → ControlLogix migration runs $15,000–$40,000 including hardware, programming, FAT/SAT and weekend commissioning. We provide fixed quotes after the discovery audit — no T&M surprises.
Yes. We collaborate with OEMs and integrators regularly. No territorial disputes — our job is to get your line back to rate. We'll co-sign documentation and respect existing IP.
Yes. Knowledge transfer is included in every project. We also deliver standalone PLC fundamentals and platform-specific courses (Studio 5000, TIA Portal, GX Works) on-site or remote.
Whether you're facing an emergency right now or planning Q3 commissioning — let's talk. 30-minute call, engineer to engineer. No sales reps, no scripts.